Categories
Categories
Price: | US $ 35-38/Piece |
---|---|
Trade Terms: | FOB,CIF,DAP |
Min Order: | 20/Piece |
Pay Type: | L/C,T/T |
Prod Model: | NN-B |
---|---|
Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
Height: | Adjustable Height |
Surface Treatment: | Linen Wrapped |
Factory Location: | Nansha District Guangzhou China |
Factory Area: | 8 000sqm |
Factory Scale: | 200 People |
Service: | ODM, OEM |
Package: | 1PC/CTN, Dismantled |
Product Level: | Middle and High Grade |
Sample Lead Time: | 5 Days |
Brand: | Yazi/ Meyart |
Material: | Fiberglass |
Gender: | Female |
Age Group: | Adults |
Using Place: | Shopping Mall |
Color: | White |
Type: | Neck Mannequin |
Style: | Neck |
Hanger Type: | Put on Table |
Model | Max.Length(cm) | Max.Width(cm) | Baseplate(cm) |
NN-S Smaller one | |||
NN-B Bigger one | 23.8 | 22 | Rose Golden chrome, Adjustable pole. |
MOQ | 5 pcs |
Mould cost | 1) No need mould cost for Yazi present item. 2) Bespoke item: 650USD for one full body mannequin. Client should supply us a sample. 3) If you have an order in 100pcs, you just need to supply us a sample, we will open the mould for you free of charge. |
Delivery time | 1) For sample: 4-10 days. 2) Common order mass production: Normally 15-20 days for one 40' HQ container. |
Payment terms | T/T, L/C It is negotiable |
Container Loading QTY | 1) 20' GP container : about 140 pcs for full body mannequin 2) 40' GP container : about 290 pcs for full body mannequin. 3) 40' HQ container : about 340 pcs for full body mannequin |
Standard Package | Inner packing: Bubble film and craft paper wrap over each limb and torso. After that we will put the 1.5cm thickness foam on each side of the carton. Outer packing: Strong corrugated carton (7 layers). |
HS Code | 9618000090 |
Welcome to visit our factory and showroom! |
Step 1 | Client supplys mannequin drawing or photos with correct size. |
Step 2 | We will sculpt the shape based on your information.(Need 10 days) |
Step 3 | Develop the initial mould. (Need 2 days) |
Step 4 | Produce the sample. (Need 7 days) |
Step 5 | Send sample to client for confirmation. |
Step 6 | If sample approved, we will develop the final mould. (7 days) |
Step 7 | Final mould will be used in the production |
Step 1 | Client supplys a mannequin sample |
Step 2 | We will develop the final mould directly. (7 days) |
Step 3 | Produce a sample, and send to client for confirmation. |
Step 4 | If sample approved, then could start the mass production. |